Industrial electrical design · Control documentation · Plant BIM

For mining, process & industrial projects

Industrial electrical design.
Drawn to your standards.

Power distribution. Control panels. Coordinated plant models. We turn engineering inputs into clear, checked drawings in your templates, so your team can keep the project moving.

Your title blocks. Your source files. One accountable team.

Electrical designControl systemsPlant BIM
From mark-up to issueAM / Design desk
Concept illustration of an industrial electrical drawing, with a redline revision and drawing register
Illustrative workflow Concept only. Not a client drawing or construction document.
Documentation partner to industry leaders
Synergy Rio Tinto Fortescue Evolution Mining Endeavour Mining CBH Group
02 / How we work

From your brief to a checked package.
A clear path to issue.

Predictable milestones. Transparent QA. No surprise invoices.

01

Define the Package

Work through the deliverables, site standards, interfaces and target issue date with your project lead.

02

Agree the Design Basis

Confirm your templates, source information, drawing register and review requirements before production begins.

03

Produce & Check

Produce the package in your engineering tools. Review the details, cross-references and revisions before issue.

04

Issue & Handover

Receive source files, PDFs and revision notes for your project review and handover.

04 / Client perspectives

The working relationship
behind the drawings.

JM
J. Marshall, Engineering Director
WA Mining Corp. · Pilbara iron-ore · 48-drawing SLD + MCC package

Advanced Mechanix delivered our documentation package under a tight deadline and caught several conflicts that would have caused major issues during construction. Their milestone tracking kept us informed at every step.

SP
S. Patel, BIM Manager
Regional Engineering Consultancy, AU · 3 concurrent commercial projects · Revit MEP

When we won three major projects at once, Advanced Mechanix integrated five additional modelers into our workflow within two weeks. Their team adapted to our standards seamlessly and we hit every deadline.

DK
D. Kazemi, Operations Manager
US Infrastructure Engineering Firm · managed-service retainer · 18-month engagement

The managed-service model transformed our documentation process. A consistent team that understands our standards has reduced review cycles and improved quality, while predictable costs simplified our budgeting.

RO
R. Okonkwo, Chief Engineer
Municipal Infrastructure Dept. · BIM transition partnership · 12-person team upskill

We needed to upgrade our team's skills to handle larger BIM projects. Advanced Mechanix provided the training and the production support — helping us develop our standards while handling overflow so our internal build-up didn't stall.

05 / Working together

Your team. Our team.
A clear way to work.

Agree the standards, review responsibilities and working arrangements before the first issue.

Quality: who checks the drawings?

The checking brief covers the project standard, drawing references and review responsibilities. We agree the internal checks, client review sequence, revision allowance and response windows as part of the package scope.

Standards: will you draw to our codes and templates?

We work to the standard that applies to your project: NEC (US), IEC 60364 and IEC 61439, AS/NZS 3000 (Australia and New Zealand), CSA C22.1 (Canada) and BS 7671 (UK). We draw inside your title blocks, layer conventions, cell and block libraries, not ours.

IP and NDA: what happens to our files?

Confidentiality and file access are agreed before source material is shared. Tell us if you require an NDA or a client-managed workspace, VDI or VPN. The scope identifies the permitted environment, access arrangements and handover requirements.

Stamps: who signs the drawings?

If your package requires a PE, Chartered Engineer or other statutory sign-off, tell us during scoping. We agree the responsible party and review requirements before production starts.

Time zones: when can we talk to the team?

Our production team is based in Pakistan (PKT, UTC+5). We agree your project’s working hours and handover arrangements during scoping. The table below uses a 09:00–18:00 PKT reference window to help plan the overlap; it is not a committed project schedule.

Scheduling reference: a 09:00–18:00 PKT window in your local time
Your time zoneReference window, your clockOverlap with your 09:00–17:00
Perth — AWST (UTC+8)12:00–21:005 h (12:00–17:00)
Brisbane, Sydney — AEST (UTC+10)14:00–23:003 h (14:00–17:00)
Dubai — GST (UTC+4)08:00–17:008 h (09:00–17:00)
London — GMT (UTC+0)04:00–13:004 h (09:00–13:00)
New York — ET (EST, UTC−5)23:00–08:00 (overnight)None — overnight handover
Los Angeles — PT (PST, UTC−8)20:00–05:00 (overnight)None — overnight handover

Daylight saving: Sydney, Melbourne, Canberra and Hobart move to AEDT (UTC+11) from October to April, cutting the overlap to 2 h (15:00–17:00); Queensland and Western Australia stay on standard time. UK summer time (BST, UTC+1) widens the London overlap to 5 h (09:00–14:00). US daylight time moves our day to 00:00–09:00 EDT and 21:00–06:00 PDT, so US teams can plan an overnight handover; the actual arrangement is agreed for your project.

06 / Before we start

The questions behind
a good working relationship.

What do you need to scope an industrial drawing package?
Tell us the plant or project type, the drawing register or deliverables, your drafting standard, engineering software and target issue date. We can agree an NDA before you share confidential source files.
Can you work in our templates and engineering tools?
Yes. We work with your title blocks, symbol libraries, layer conventions and project specifications in tools including AutoCAD Electrical, Microstation, EPLAN, SkyCAD and Revit. We confirm the required toolset and deliverable format during scoping.
How are drawings checked before issue?
The production workflow includes peer review, a senior check and review against the applicable project standard. Drawing references and revisions are checked as part of the package. Any certification or statutory sign-off requirement is agreed separately before work starts.
How do you agree delivery dates and pricing?
We scope the drawing types, source information, review requirements and issue sequence with you before confirming a programme and price. Engagements can be fixed-scope packages or managed production support.
What do we receive at handover?
The agreed source files, PDF drawing set and revision information. We confirm the drawing register and handover requirements with your team at the start of the engagement.
07 / Start the conversation

Where is your project
getting held up?

Tell us the package, the standard and the deadline. We’ll work through the scope with you and agree the next step before production starts.

☎
🕐

Response

We’ll review the scope and agree your next step.

Tell us about the package

Request received. Our team will reply to discuss your scope and next steps.
✓ Scope and deliverables agreed before production
✓ Mutual NDA signed before any source material shared
✓ A named point of contact for your package

Enquiries are delivered through FormSubmit. Please keep confidential details out until an NDA is in place. Privacy policy.