Civil & structural design outsourcing — drawings that survive construction.
Site development, structural foundations, infrastructure, and permit packages for industrial, mining, and commercial projects. Built to your jurisdiction's codes.
Civil and structural design outsourcing covers site development, earthworks and volume calculations, structural foundations and permit packages for industrial, mining and commercial projects. We work to IBC 2021, ACI 318, AISC 360 and ASCE 7-22 in the US, AS 3600, AS 4100 and AS/NZS 1170 in Australia, and Eurocodes in Europe, with PE-stamped drawings available in applicable US jurisdictions through partner PEs.
Constructible drawings. Compliant calculations. Ready for the field.
Civil and structural documentation that slips schedules or fails plan-check isn't documentation — it's liability. Our team produces site plans, foundation designs, and permit packages that are built to pass review on first submission and hold up in field construction.
From greenfield mining site development to industrial expansion foundations to commercial permit packages, we deliver constructible documentation backed by PE-stamped calculations where applicable.
- Civil 3D, MicroStation, Revit Structure
- PE stamps available in applicable jurisdictions
- Earthworks and site balance optimization
- Multi-discipline clash detection included

Every civil & structural drawing your project needs
Site Development Plans
Complete site layouts, grading plans, and drainage designs for industrial, mining, and commercial projects.
Structural Foundations
Foundation designs for industrial equipment, process plants, transformer pads, and supporting structures.
Infrastructure & Utilities
Roads, drainage systems, and underground utility networks designed to regional jurisdiction standards.
Earthwork Calculations
Cut and fill analysis, volume calculations, mass haul diagrams, and site-balance optimization.
Permit Documentation
Complete permit packages including plan sets, calculations, stamps, and AHJ-specific supporting documentation.
Structural Steel & Concrete
Detailed structural steel connection design, concrete reinforcement, and framing plans per AISC / ACI.
Four steps from site survey to construction set
Scope & Codes
Confirm project scope, jurisdiction codes, and stamp requirements. Site survey review.
Concept Design
Concept plan and calculation summary for client review before full production begins.
Production
Prepare the scoped drawings and supporting documents against the agreed review brief.
Stamp & Issue
PE stamps applied where required. Construction-set issued with calculations package.
Start with a defined scope.
Agree the source information, deliverables and review requirements before the first issue.
Your team. Our team.
A clear way to work.
Agree the standards, review responsibilities and working arrangements before the first issue.
Quality: who checks the drawings?
The checking brief covers the project standard, drawing references and review responsibilities. We agree the internal checks, client review sequence, revision allowance and response windows as part of the package scope.
Standards: will you draw to our codes and templates?
We work to the standard that applies to your project: NEC (US), IEC 60364 and IEC 61439, AS/NZS 3000 (Australia and New Zealand), CSA C22.1 (Canada) and BS 7671 (UK). We draw inside your title blocks, layer conventions, cell and block libraries, not ours.
IP and NDA: what happens to our files?
Confidentiality and file access are agreed before source material is shared. Tell us if you require an NDA or a client-managed workspace, VDI or VPN. The scope identifies the permitted environment, access arrangements and handover requirements.
Stamps: who signs the drawings?
If your package requires a PE, Chartered Engineer or other statutory sign-off, tell us during scoping. We agree the responsible party and review requirements before production starts.
Time zones: when can we talk to the team?
Our production team is based in Pakistan (PKT, UTC+5). We agree your project’s working hours and handover arrangements during scoping. The table below uses a 09:00–18:00 PKT reference window to help plan the overlap; it is not a committed project schedule.
| Your time zone | Reference window, your clock | Overlap with your 09:00–17:00 |
|---|---|---|
| Perth — AWST (UTC+8) | 12:00–21:00 | 5 h (12:00–17:00) |
| Brisbane, Sydney — AEST (UTC+10) | 14:00–23:00 | 3 h (14:00–17:00) |
| Dubai — GST (UTC+4) | 08:00–17:00 | 8 h (09:00–17:00) |
| London — GMT (UTC+0) | 04:00–13:00 | 4 h (09:00–13:00) |
| New York — ET (EST, UTC−5) | 23:00–08:00 (overnight) | None — overnight handover |
| Los Angeles — PT (PST, UTC−8) | 20:00–05:00 (overnight) | None — overnight handover |
Daylight saving: Sydney, Melbourne, Canberra and Hobart move to AEDT (UTC+11) from October to April, cutting the overlap to 2 h (15:00–17:00); Queensland and Western Australia stay on standard time. UK summer time (BST, UTC+1) widens the London overlap to 5 h (09:00–14:00). US daylight time moves our day to 00:00–09:00 EDT and 21:00–06:00 PDT, so US teams can plan an overnight handover; the actual arrangement is agreed for your project.
Questions civil managers ask us
What codes do you work to?
Can you provide stamped drawings?
How do you handle earthworks and volume calculations?
Do you coordinate with architects and structural on multi-discipline projects?
Ready to offload your civil & structural backlog?
Book a 30-minute scoping call. First drawing on us — you see the quality before you commit to scope.




