AHJ-ready permit packages. Every time. Every jurisdiction.
Stop losing installs to permit delays. We prepare complete solar permit packages — PV layouts, electrical SLDs, structural letters, interconnection — for every AHJ your team works with.
Your sales team should be closing deals, not fighting plan-check.
Permit delays kill solar projects. One rejected package can slip installation by three weeks and cost the EPC tens of thousands in scheduling and holding costs. Most delays come from the same handful of errors — missing AHJ-specific details, outdated NEC references, wrong structural calculations.
We prepare AHJ-ready permit packages for commercial and industrial solar EPCs. Complete PV layouts, electrical single-line diagrams, structural letters, and utility interconnection applications — validated against the specific AHJ before submission.
- 200+ AHJ checklists on file
- Full NEC 2023 Art. 690 compliance
- Utility interconnection applications included
- First package free for new EPC partners
Complete permit-ready packages
PV System Layouts
Complete photovoltaic system layouts — rooftop, ground-mount, and carport configurations with setbacks and array blocking.
Electrical Single-Line Diagrams
Complete DC and AC single-line diagrams with string configurations, combiner boxes, inverters, and point of common coupling.
Structural Calculations & Letters
Roof and ground-mount structural assessments per ASCE 7-22. PE-stamped structural letters available in applicable jurisdictions.
AHJ Permit Packages
Complete AHJ-ready permit packages including cover sheet, plan set, calculations, product data sheets, and stamps.
Utility Interconnection
Complete utility interconnection applications including supplemental review documentation and technical Q&A responses.
As-Built Documentation
Post-installation documentation capturing the final installed configuration — with red-line mark-up and drawing reconciliation.
From site survey to plan-check pass in four steps
Site & BOM Intake
Send site survey, photos, and BOM. We confirm AHJ, utility, and any special requirements.
Draft Package
Draft PV layout, SLD, and structural letter. Internal QA against AHJ checklist.
Client Review
You review, redline. We iterate within 24 hours. Package finalized and stamped where required.
Submit & Support
Submit to AHJ and utility. We respond to plan-check queries at no additional charge.
Package
Free
Your first permit package is on us.
Send us your next commercial permit site survey and BOM. We'll prepare the full AHJ-ready package free. If it doesn't pass plan-check on first submission, we'll revise it at no cost.
We can afford this because we maintain AHJ-specific checklists for 200+ jurisdictions, so first-submission pass rates are high.
Questions solar EPC operations leaders ask us
What AHJs have you worked with?
Do you prepare NEC 2023 compliant packages?
What is your turnaround on a standard commercial permit package?
Can you handle utility interconnection applications?
Do you do residential as well as commercial?
Stop losing installs to permit delays.
Offload your permitting to a team that knows every AHJ in your service area. First package free.
Book EPC Call



