PV electrical documentation for industrial sites.
Treat the PV installation as part of the plant electrical system: equipment ratings, distribution interfaces, connection details and review requirements need to agree.
Start at the plant interface.
Supply the equipment information, current SLD, site layout and proposed connection point. The drawing scope can include the PV arrangement, electrical single-line, equipment references and the connection documentation agreed with your engineering team.
Identify the utility or reviewer requirements in the brief. Submission, design calculations, certification and any field verification need named owners rather than being assumed from the drawing scope.
One package, several inputs.
- PV and inverter equipment information
- Existing supply and distribution references
- Plant load and connection information
- Drawing and equipment naming conventions
- Review comments and issue requirements
- Native files, PDFs and the drawing register at handover
For review preparation, use the industrial PV drawing review checklist. For wider industrial work, see electrical design documentation and control panel documentation .