A production plan built around your project.
Tell us the source information, drawing types and target issue date. We agree the deliverables, review allowance and price before work starts.
Revit production needs a clear coordination brief.
Adding model capacity only helps if the new work follows the same coordinates, worksets, naming and issue process as the rest of the project. We produce the agreed Revit models and drawing outputs against your BIM Execution Plan, with the discipline interfaces and review owner defined before work starts.
Send the current model register, required level of development and source information. We can then scope the modelling, drawing production and coordination tasks separately. For existing industrial facilities, our plant modelling service focuses on equipment layouts, containment and converting legacy information.
- Pilot-first engagement (you validate quality before scale)
- Multi-discipline modeling (E / M / S / A) coordinated in one federation
- Weekly clash reports with severity classification, not just counts
- Custom Revit family libraries built to your content standard
- BIM 360, ProjectWise, or client-hosted VDI environments
- Scope and review requirements agreed before production
Every BIM deliverable your project needs
2D to 3D Conversion
Convert legacy drawings, scanned docs, and PDFs into coordinated parametric Revit models at your required LOD.
Multi-Discipline Revit Modeling
Electrical, MEP, structural, architectural modeling with central federation, worksets, and shared-coordinate discipline.
Navisworks Clash Detection
Weekly clash reports categorized by severity and discipline. Resolution tracking in BIM 360, ProjectWise, or your issue tracker.
Digital Twin Creation
Data-linked digital twins with tagged equipment, room relationships, and CMMS-ready metadata for facility operations.
Shop Drawings & Fabrication
Fabrication-ready shop drawings generated from coordinated models with BOMs, cut sheets, and installation detail.
Custom Revit Family Libraries
Parametric Revit families with shared parameters, type catalogs, and MEP connectors built to your content standard.
Four steps from BEP review to coordinated model
BEP Review
We align on LOD, file exchange, content library, coordinate system, and milestone schedule against your BEP.
Pilot Model
One discipline, one area, modeled as a pilot. You validate quality against your standards before full production.
Production + Clash
Weekly sprints with clash reports, milestone QA, and integrated BIM 360 / ProjectWise review.
Handover
Clash-resolved models, shop drawings, digital twin data, family libraries, and full revision log delivered.
Start with a defined scope.
Agree the source information, deliverables and review requirements before the first issue.
Built for engineering consultancies & EPCs
MEP Consultancies
Peak-workload Revit production support without hiring. We act as your BIM production team under your title block.
Engineering EPCs
Multi-discipline coordination and shop-drawing production for industrial, oil & gas, and commercial EPC packages.
Owners / Operators
Brownfield 2D-to-3D conversion and digital twin creation for facility management, asset tracking, and maintenance planning.
Your team. Our team.
A clear way to work.
Agree the standards, review responsibilities and working arrangements before the first issue.
Quality: who checks the drawings?
The checking brief covers the project standard, drawing references and review responsibilities. We agree the internal checks, client review sequence, revision allowance and response windows as part of the package scope.
Standards: will you draw to our codes and templates?
We work to the standard that applies to your project: NEC (US), IEC 60364 and IEC 61439, AS/NZS 3000 (Australia and New Zealand), CSA C22.1 (Canada) and BS 7671 (UK). We draw inside your title blocks, layer conventions, cell and block libraries, not ours.
IP and NDA: what happens to our files?
Confidentiality and file access are agreed before source material is shared. Tell us if you require an NDA or a client-managed workspace, VDI or VPN. The scope identifies the permitted environment, access arrangements and handover requirements.
Stamps: who signs the drawings?
If your package requires a PE, Chartered Engineer or other statutory sign-off, tell us during scoping. We agree the responsible party and review requirements before production starts.
Time zones: when can we talk to the team?
Our production team is based in Pakistan (PKT, UTC+5). We agree your project’s working hours and handover arrangements during scoping. The table below uses a 09:00–18:00 PKT reference window to help plan the overlap; it is not a committed project schedule.
| Your time zone | Reference window, your clock | Overlap with your 09:00–17:00 |
|---|---|---|
| Perth — AWST (UTC+8) | 12:00–21:00 | 5 h (12:00–17:00) |
| Brisbane, Sydney — AEST (UTC+10) | 14:00–23:00 | 3 h (14:00–17:00) |
| Dubai — GST (UTC+4) | 08:00–17:00 | 8 h (09:00–17:00) |
| London — GMT (UTC+0) | 04:00–13:00 | 4 h (09:00–13:00) |
| New York — ET (EST, UTC−5) | 23:00–08:00 (overnight) | None — overnight handover |
| Los Angeles — PT (PST, UTC−8) | 20:00–05:00 (overnight) | None — overnight handover |
Daylight saving: Sydney, Melbourne, Canberra and Hobart move to AEDT (UTC+11) from October to April, cutting the overlap to 2 h (15:00–17:00); Queensland and Western Australia stay on standard time. UK summer time (BST, UTC+1) widens the London overlap to 5 h (09:00–14:00). US daylight time moves our day to 00:00–09:00 EDT and 21:00–06:00 PDT, so US teams can plan an overnight handover; the actual arrangement is agreed for your project.
BIM outsourcing questions we answer on day one
How is Revit production different from modelling a legacy plant?
How do you join an existing model environment?
How are clash reviews and changes scheduled?
Your BIM backlog, handled.
Tell us the source information, drawing types and target issue date. We agree the deliverables, review allowance and price before work starts.
Scope your project



